Watergate Schedule

 

Click month to view events occurred



 




Calendar of Events

March 2000

25 -

1. Work Completed:  Ruins sample begun as per request by C
    Lowe.
2. Work Planned:  Bidding process started.
3. Meetings Held: R. Harvey, CDC contacted, RE: engineering of
    steel and weight load of building.
4. Meetings Planned: None
5. Scope of Work or Schedule Impacts: None

 

 

back to top
 

April 2000

10 -

1. Work Completed:  Bid sent to C Lowe. Ruins sample sent to K
    Neidow. 
2. Work Planned:  Mock-up begun.
3. Meetings Held: In-house design meetings.
4. Meetings Planned: None
5. Scope of Work or Schedule Impacts: None

   
25 -

1. Work Completed:  Ruins mockup approved by D. Bradley. Work on ageing begun by MILESTONE.
2. Work Planned:  New bid to address addition of components.
3. Meetings Held: R. Harvey, weight load of MILESTONE ruins approved for building.
4. Meetings Planned: None
5. Scope of Work or Schedule Impacts: None

 
 
back to top
 

May 2000

10 -

1. Work Completed:  Normal WIP.
2. Work Planned:  Completion of new ruins sample.
3. Meetings Held: None
4. Meetings Planned: None
5. Scope of Work or Schedule Impacts: None

   
25 -

1. Work Completed:  New bid submitted to M. Filipowicz at Sigal. Normal WIP.
2. Work Planned:  Furniture bases and entry design.
3. Meetings Held: In-house design staff meetings to complete design phase.
4. Meetings Planned: None
5. Scope of Work or Schedule Impacts: None

 
 
back to top
 
June 2000
10 -

1. Work Completed:  New full-scale design including entry sent to C. Lowe.  New sample sent to C. Lowe.
2. Work Planned:  Re-bid as per changes in SOW.
3. Meetings Held: Mitch at Sigal RE: SOW.
4. Meetings Planned: None
5. Scope of Work or Schedule Impacts: None

   
25 -

1. Work Completed:  Bid sent to T. Grypeos, and Mitch at Sigal RE: final SOW changes.
2. Work Planned:  Eliminate charcoal ageing compound from new sample and rework in bronze tones.
3. Meetings Held: C. Lowe RE: ageing sample issues.
4. Meetings Planned: None
5. Scope of Work or Schedule Impacts: None

 
back to top
 

July 2000

10 -

1. Work Completed: WIP continues on new ageing of sample. 
2. Work Planned: Completion of sample. Send Project design renderings to C. Lowe. Deploy Project Website.
3. Meetings Held: C. Lowe, Mitch with Sigal, RE: award of contract to Sigal and MILESTONE.
4. Meetings Planned: Award of signed contract and funds to MILESTONE.
5. Scope of Work or Schedule Impacts: None.

   
25 -

1. Work Completed: Design review completed with C. Lowe. Modern Doric capitol, base and frieze chosen. R. Harvey of Curtain Wall Design alerted that steel engineering must commence for ruins, and seating. Funds from MILESTONE given to Aviation firm to hold place in Cutting Line. Funds given from MILESTONE for materials used by cutting firm. Mold shop space allocated for Advisory Board Project, Production space allocated for project. Final rendering of design completed for C. Lowe approvals.
2. Work Planned: Get funding from Sigal/Tasos. 
3. Meetings Held: Spoke with Ed Hunter, Mitch and Tasos regarding funding for project. Assurances made that funding will occur.
4. Meetings Planned: Review for final production approvals renderings with C. Lowe. Review of funding and scheduling with Sigal and Tasos.
5. Scope of Work or Schedule Impacts: Slight setback due to lack of funding from Washington.

 
 
back to top
 

August 2000

10 -

1. Work Completed: WIP continues on revisions of entablature, amphitheatre seating, bench and entry. 
2. Work Planned: Completion of designs for C. Lowe, Mr. Boggs, Mr. Bradley. Send Project design renderings to C. Lowe, Mitch & Ed at Sigal. Update Tassos on all projects Update photographs on Project Website.
3. Meetings Held: Design staff, CNC Cutting Companies, Mitch daily with revisions, 3-D rendering staff
4. Rodney Harvey at CDC begins engineering and shop drawings. 5. Meetings Planned: CNC Cutting of mold originals, ordering of custom colourants, mold materials, etc.
6. Scope of Work or Schedule Impacts: Final deadlines for element sized must be completed or project will be out of scope.

   
   
back to top
 
September 2000
The following photographs depict mold originals cut by CNC routers for the Amphitheatre Seating, Entry Block and Bench Seating. Entablature pieces are shown with the column capitol elements ready for molding.
 
Mold originals are checked for accuracy, sanded, built up if needed until they are perfect replicas of the drawings. Boxes are made for the originals; mold rubber is poured and plaster is used for backing.

Click here for Photos

 
back to top
 
 
October 2000
The following molds have been made and pieces are being cast , cured and crated in readiness for the first truck to arrive in Washington, DC 10.28.00 picture #1 shows the bull nose edge of the seating face, #2 the seating radii, #3 the set of seating elements, #4, one of the entry blocks.

Click here for Photos

 
 
back to top
 

                                                                                                                            

 