| March 2000 | |
|
25 - |
1. Work Completed: Ruins sample begun
as per request by C |
|
|
|
| back to top | |
|
April 2000 |
|
|
10 - |
1. Work
Completed: Bid sent to C Lowe. Ruins sample sent to K |
| 25 - |
1. Work Completed:
Ruins mockup approved by D. Bradley. Work on ageing begun by
MILESTONE. |
| back to top | |
May 2000 |
|
| 10 - |
1. Work Completed:
Normal WIP. |
| 25 - |
1. Work Completed: New
bid submitted to M. Filipowicz at Sigal. Normal WIP. |
| back to top | |
| June 2000 | |
| 10 - |
1. Work Completed: New
full-scale design including entry sent to C. Lowe. New sample sent
to C. Lowe. |
| 25 - |
1. Work Completed: Bid
sent to T. Grypeos, and Mitch at Sigal RE: final SOW changes. |
| back to top | |
|
July 2000 |
|
| 10 - |
1. Work Completed: WIP
continues on new ageing of sample. |
| 25 - |
1. Work Completed:
Design review completed with C. Lowe. Modern Doric capitol, base and
frieze chosen. R. Harvey of Curtain Wall Design alerted that steel
engineering must commence for ruins, and seating. Funds from
MILESTONE given to Aviation firm to hold place in Cutting Line.
Funds given from MILESTONE for materials used by cutting firm. Mold
shop space allocated for Advisory Board Project, Production space
allocated for project. Final rendering of design completed for C.
Lowe approvals. |
| back to top | |
|
|
|
| 10 - |
1. Work Completed: WIP
continues on revisions of entablature, amphitheatre seating, bench
and entry. |
| back to top | |
|
|
|
| September 2000 | |
|
The following photographs depict
mold originals cut by CNC routers for the Amphitheatre Seating,
Entry Block and Bench Seating. Entablature pieces are shown with the
column capitol elements ready for molding. Mold originals are checked for accuracy, sanded, built up if needed until they are perfect replicas of the drawings. Boxes are made for the originals; mold rubber is poured and plaster is used for backing. |
|
| back to top | |
|
|
|
| October 2000 | |
| The following molds have been made and pieces are being cast , cured and crated in readiness for the first truck to arrive in Washington, DC 10.28.00 picture #1 shows the bull nose edge of the seating face, #2 the seating radii, #3 the set of seating elements, #4, one of the entry blocks. | |
| back to top | |
|
|
|